{"id":32,"date":"2019-05-14T06:51:51","date_gmt":"2019-05-14T06:51:51","guid":{"rendered":"http:\/\/www.aapqss.com\/en\/?page_id=32"},"modified":"2021-10-16T11:38:38","modified_gmt":"2021-10-16T11:38:38","slug":"qs-services-for-construction-contractors","status":"publish","type":"page","link":"https:\/\/www.aapqss.com\/en\/qs-services-for-construction-contractors\/","title":{"rendered":"QS Services for Construction Contractors"},"content":{"rendered":"<p><strong>Professional quantity surveying services that have been provided to construction contractors are:<\/strong><\/p>\n<ul>\n<li><strong>Verifying the tender bills of quantities and highlighting the overestimated and underestimated items to be used for strategic pricing purpose.<\/strong><\/li>\n<li><strong>Reviewing the tender contract form and particular conditions in parallel with the tender drawings, specifications, BOQ preamble, and the considered methods of measurement.<\/strong><\/li>\n<li><strong>Pricing tender documents and preparing the required price analysis, overhead and construction costs.<\/strong><\/li>\n<li><strong>Preparing the cost estimate for the tender including the direct and indirect costs, Value Added Tax- if any, overhead and profit after identifying the tender scope of work and required construction works, required construction time and services in compliance with the tender pricing documents. <\/strong><\/li>\n<li><strong>Identifying the pricing risks due to material inflation, currency fluctuation \u2026etc.<\/strong><\/li>\n<li><strong>Establishing the source of origin contacts list&nbsp;for all the required material and equipment to be delivered to site to be carried out the procurement department.<\/strong><\/li>\n<li><strong>Reviewing the work schedule to be in compliance with the tender requirements &amp; required criteria.<\/strong><\/li>\n<li><strong>Leading the preparation of commercial and technical proposals to ensure that they are no missing required documents as per the tender requirements.<\/strong><\/li>\n<li><strong>Preparing project budget and predicted cash flow (in and out) once it is being awarded by the client.<\/strong><\/li>\n<li><strong>Managing the preparation and submission of daily reports, monthly progress reports, material submittals, works schedule, shop drawings, as built drawings during the overall project duration.&nbsp; <\/strong><\/li>\n<li><strong>Selecting of sub-contractors, suppliers and other third parties who will carry out partial of construction works in compliance to their capabilities and profession, and preparing the corresponding subcontracts accordingly. <\/strong><\/li>\n<li><strong>Controlling the purchase orders for the material to be delivered to site based on IFC drawings or approved shop drawings and approved material.<\/strong><\/li>\n<li><strong>Updating the budget and cash flow based on actual construction on site and doing the cost to complete exercise regularly during the construction works. <\/strong><\/li>\n<li><strong>Conducting a dilapidation study prior the commencement of the construction works at site based on the project location and particular conditions.<\/strong><\/li>\n<li><strong>Managing the preparation of traffic plans and\/or environmental plans for water construction projects if required.<\/strong><\/li>\n<li><strong>Preparing of interim payments including stored material on\/off site, variation orders, and claims due to additional works and\/or revised scope of works if any.<\/strong><\/li>\n<li><strong>Chairing site meetings with sub-contractors, key staff, client representatives and any other third parties.<\/strong><\/li>\n<li><strong>Monitoring the progress of construction works.<\/strong><\/li>\n<li><strong>Managing activities on site.<\/strong><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Professional quantity surveying services that have been provided to construction contractors are: Verifying the tender bills of quantities and highlighting the overestimated and underestimated items to be used for strategic pricing purpose.<a class=\"moretag\" href=\"https:\/\/www.aapqss.com\/en\/qs-services-for-construction-contractors\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-sidebar.php","meta":[],"_links":{"self":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/32"}],"collection":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/comments?post=32"}],"version-history":[{"count":2,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/32\/revisions"}],"predecessor-version":[{"id":111,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/32\/revisions\/111"}],"wp:attachment":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/media?parent=32"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}