{"id":28,"date":"2019-05-14T06:51:01","date_gmt":"2019-05-14T06:51:01","guid":{"rendered":"http:\/\/www.aapqss.com\/en\/?page_id=28"},"modified":"2021-10-16T11:39:00","modified_gmt":"2021-10-16T11:39:00","slug":"general-qs-services","status":"publish","type":"page","link":"https:\/\/www.aapqss.com\/en\/general-qs-services\/","title":{"rendered":"Quantity Surveyor Services"},"content":{"rendered":"<p><img loading=\"lazy\" class=\"alignright wp-image-13 size-full\" src=\"http:\/\/www.aapqss.com\/en\/wp-content\/uploads\/2019\/05\/qs-contractor.png\" alt=\"Quality Services \" width=\"350\" height=\"190\" srcset=\"https:\/\/www.aapqss.com\/en\/wp-content\/uploads\/2019\/05\/qs-contractor.png 350w, https:\/\/www.aapqss.com\/en\/wp-content\/uploads\/2019\/05\/qs-contractor-300x163.png 300w\" sizes=\"(max-width: 350px) 100vw, 350px\" \/><\/p>\n<ul>\n<li><strong>Preparing Bill of Quantity for a project during different design phases.<\/strong><\/li>\n<li><strong>Verifying Bill of Quantities based on design drawings.<\/strong><\/li>\n<li><strong>Providing pieces of advice related to contract form &amp; special conditions to be customized based on special project conditions and client requirements.<\/strong><\/li>\n<li><strong>Cost estimating and budgeting during different design phases.<\/strong><\/li>\n<li><strong>Preparing a complete set bidding documents.<\/strong><\/li>\n<li><strong>Bids evaluation &amp; examination.<\/strong><\/li>\n<li><strong>Contract administration.<\/strong><\/li>\n<li><strong>Providing Value Engineering proposals. <\/strong><\/li>\n<li><strong>Preparing project expected vs actual cash flow and giving advice to client.<\/strong><\/li>\n<li><strong>Carrying out cost to complete exercises. <\/strong><\/li>\n<li><strong>Evaluating and advising on financial implications and appropriate management actions. <\/strong><\/li>\n<li><strong>Preparing or reviewing of change orders \/ variation orders.<\/strong><\/li>\n<li><strong>Preparing and reviewing of take-off quantities for civil and architectural works during the project construction works based on approved shop drawings or the latest received issued for construction \u201cIFC\u201d drawings.<\/strong><\/li>\n<li><strong>Carrying out monthly interim valuations for contractors, and sub-contractors valuations including all the required supporting documents.<\/strong><\/li>\n<li><strong>Creating of project\u2019s material list for procurement department.<\/strong><\/li>\n<li><strong>Managing the procurement of plant and material such as Tower Crane and supply of steel reinforcement, tiles \u2026etc.<\/strong><\/li>\n<li><strong>Collecting data for reports and preparing monthly progress report. <\/strong><\/li>\n<li><strong>Preparing claims for the project related to time extension and cost compensation. <\/strong><\/li>\n<li><b>Undertake qualification process in accordance with client\u2019s specific requirements.<\/b><\/li>\n<li><strong>Manage the tender process, review and analyze tender returns and prepare a recommendation to the client.<\/strong><\/li>\n<li><strong>Input into value and risk management workshops as required by the client.<\/strong><\/li>\n<li><strong>As primary project cost controller, ensures that the project remains on budget through the design and construction phases.<\/strong><\/li>\n<li><strong>Reviewing and comparing scopes of work, production rates, and cost data.<\/strong><\/li>\n<li><strong>Preparation of earned value reports.<\/strong><\/li>\n<li><strong>Reviewing and evaluating of payment certificates for Subcontractors\/GC Contractor.<\/strong><\/li>\n<li><strong>Evaluating and negotiating variations and change orders in liaison with the Contract Administrator, Commercial Manager, Design and Construction Team.<\/strong><\/li>\n<li><strong>Evaluating and negotiating final accounts settlements.<\/strong><\/li>\n<\/ul>\n<p style=\"text-align: center;\"><strong>&nbsp; &nbsp;Email:<\/strong>&nbsp;<a href=\"mailto:abd_awad@yahoo.com\">abdallah@aapqss.com<\/a><\/p>\n<p style=\"text-align: center;\">&nbsp; or &nbsp;<a href=\"mailto:info@AAPQSS.com\">info@aapqss.com<\/a><\/p>\n<p style=\"text-align: center;\"><strong>Mobile:<\/strong>&nbsp; +970 598317347<\/p>\n<p style=\"text-align: center;\"><strong>WhatsApp:<\/strong>&nbsp; +970 598317347<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Preparing Bill of Quantity for a project during different design phases. Verifying Bill of Quantities based on design drawings. Providing pieces of advice related to contract form &amp; special conditions to be<a class=\"moretag\" href=\"https:\/\/www.aapqss.com\/en\/general-qs-services\/\">Read More&#8230;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-sidebar.php","meta":[],"_links":{"self":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/28"}],"collection":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/comments?post=28"}],"version-history":[{"count":11,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/28\/revisions"}],"predecessor-version":[{"id":108,"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/pages\/28\/revisions\/108"}],"wp:attachment":[{"href":"https:\/\/www.aapqss.com\/en\/wp-json\/wp\/v2\/media?parent=28"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}